In order to maximize the performance of the Tidal LA system I have ordered three weeks ago a Wadax reference PSU to be partnered with the Wadax reference server. I am going to add one - and possibly two - Akasa reference dc cable(s) to it. The delivery time is said to be about 10-12 weeks, so hopefully the ‘Wadax package’ will arrive somewhere at the end of February 2024. Two pure copper slabs of 2.5cm thickness stacked on top of each other (with a total weight of about 50 kg) will be used again as a platform for the Wadax reference PSU.
Last edited: